31/10/2026 - Webrich Software
Why the Site Visit Sequence Matters
An EPC is only as reliable as the information collected on site. The software does a lot of the calculation, but it depends on what the assessor measures, identifies and evidences during the visit.
A walkthrough from Lewis at Energy Smart shows how a working assessor moves through an ordinary cavity-wall house with a single-storey flat-roof extension. It takes about 20 to 40 minutes on site, depending on the complexity of the property, and the rest is finished at the desk.
For DEA trainees, the useful lesson is the order of work. A consistent routine makes it far less likely that you will leave without a measurement, photo or heating detail. If you want more background on the certificate itself, read The Ultimate Guide to an EPC alongside this post.
Step 1: Walk the Outside First
After introducing yourself to the customer, go back outside before starting any measurements. The aim is to get your bearings and understand how the building is put together.
Start at the front and work round to the back, taking photos for audit purposes as you go. In this example, the rear view reveals the feature that shapes the whole survey: a single-storey flat-roof extension at the side.
That extension has to be separated from the main house so its flat roof is properly accounted for. Identifying this early tells you how to divide the property before you measure anything indoors.
Tip: Decide how the property splits into main dwelling and extensions while you are still outside. It is easier to measure correctly when you already know which walls belong to which part.
Step 2: Look for Evidence of Cavity Fill
The assessor also photographs the injection holes to show that the cavity has been filled. This house is a useful example because it has an older, less common installation. Instead of simply drilling small holes, the installer removed a core of brick, injected the insulation and then filled the core back in.
The repairs are visible beneath a window, on each side of it and between neighbouring windows. An assessor who only expects one type of drill pattern could easily overlook them.
Remember: Do not assume that every filled cavity looks the same. Look closely at the brickwork, and photograph what you find rather than relying on a general impression.
Finding evidence of fill tells you insulation is recorded correctly on the EPC, not that it is performing well. For the wider picture, see Cavity Wall Insulation Problems: Damp, Voids and What Installers Must Check.
Step 3: Measure Up and Build the Plan
Once inside, the first job is to take measurements so you have the size of the property. These go into the software, with the main house and extension entered as separate parts.
The software then calculates the areas and heat loss elements, including the heat loss walls of each part. This is helpful, but it does not remove the need for judgement. If you split the property incorrectly, the software will calculate the wrong geometry very accurately.
On the first floor, the assessor also measures the room height from floor to ceiling. In this house it is about 2.35 m, which Lewis describes as very average for a property of its age.
Step 4: Record the Heating System
With the dimensions done, the assessor moves on to the central heating. The sequence is simple: find the heat source, identify the controls, then check the hot water.
| Item | What to check | Why it matters |
|---|---|---|
| Boiler | Exact make and model | Lets you find it in the database, which supplies the system details |
| Radiators | Thermostatic radiator valves | Records the control fitted at the emitters |
| Hallway | Room thermostat | Records temperature control for the system |
| Kitchen | Programmer or timer | Records time control for the system |
| Hot water cylinder | Insulation type, cylinder thermostat and pump type | Records how hot water is stored and controlled |
Ask the homeowner where the boiler and cylinder are, as it saves time. In this house the boiler is in a downstairs bathroom and the cylinder is upstairs, so neither would necessarily be found in the first place you look.
Photograph the boiler details, each of the heating controls and the cylinder, and make a note on your paperwork at the same time. In this example, the cylinder has factory-fitted foam insulation and a thermostat, and both are noted and evidenced.
Did you know? A precise boiler make and model does much of the work for you, as the database can tell you what you need to know about the system. That is why a quick look at the casing is not enough.
Step 5: Go Room by Room
With the main system recorded, work through each room and check the same things every time:
- Lighting: what is installed in each room
- Heating: which rooms are heated, and how
- Glazing: the windows throughout the property
- Secondary heating: any additional heat source
- Other features: anything else that affects the assessment, such as the open chimney found in this house
Repeat the same routine upstairs. A fixed checklist is what stops a room being skipped when a homeowner is talking to you or the layout is awkward.
This stage also includes a wall thickness measurement, taken and photographed for audit purposes. Here, it helps show that the wall is a normal cavity construction rather than solid brick.
Step 6: Finish in the Loft
The main reason for going into the loft is to measure the insulation depth. Putting a tape measure into the insulation shows about 100 mm, or 4 inches, in this property.
Measure it rather than estimating from the hatch. Loft insulation is one of the most familiar items on an EPC, and a measured depth is much stronger than a quick glance.
When You Need Documentary Evidence
Most of the information can be gathered simply by moving around the property. However, you cannot always verify what you have been told by looking at it. Lewis gives three examples where a homeowner may have carried out additional work:
- Loft conversions
- Updated double-glazed windows
- Walls insulated internally
In these situations, you may need documentary evidence to support what the homeowner says. It is worth asking about recent work at the start of the visit, so the homeowner has time to find any paperwork before you leave.
This matters beyond the certificate. Landlords often rely on these recorded improvements when trying to improve their rating, as covered in How to Raise an EPC Rating From D to C.
From Site Notes to the EPC Register
Once the site visit is over, the assessment is completed using accredited software and the EPC is lodged on the register. The quality of that final stage depends on your notes, measurements and photos, because you may no longer have access to the property when a gap appears.
A short checklist before you leave can help:
- Have you photographed the front and rear of the property?
- Have you evidenced any cavity fill and the wall thickness?
- Is every extension measured and entered separately?
- Do you have the boiler’s exact make and model?
- Have you recorded all the controls and the cylinder details?
- Have you covered lighting, heating and glazing in every room?
- Have you measured the loft insulation?
- Have you asked for evidence of any work you cannot verify?
To turn this routine into exam preparation, the DEA Exam Workflow Revision Guide shows how to structure your study.
How RetrofitReady Fits Into This
Watching a site visit helps you understand the process, but exams also test whether you can apply it. RetrofitReady: DEA offers 360 DEA questions covering safe practice, preparation, assessment, EPC production and focused supplement units, so you can test the same stages described in this post.
Try a short set on one stage, such as assessment or EPC production, and use the explanations to find out why any wrong answers were wrong. Then repeat that topic later in the week before moving on to mixed practice.
The DEA app is part of the wider RetrofitReady suite, which offers 1900+ questions across 4 apps. Start with the free quizzes or browse the full RetrofitReady app suite.
FAQ
How long does a domestic EPC site visit take?
A typical visit takes about 20 to 40 minutes, depending on the complexity of the property. The assessment is then finished at a desk using accredited software before the EPC is lodged on the register.
Why does a Domestic Energy Assessor take photos during an EPC visit?
Photos support the assessment for auditing purposes. They typically record the front and rear elevations, cavity injection holes, boiler details, heating controls, the hot water cylinder and wall thickness.
How can an assessor tell that cavity wall insulation has been installed?
Look for visible evidence such as injection holes in the external walls, then photograph it. Patterns vary by system, and some older installations removed a core of brick, injected the insulation and then filled the core back in.
What information does a DEA need from the boiler?
The assessor needs the exact make and model so the boiler can be identified in the product database, which supplies the system details needed for the assessment.
When does a homeowner need to provide documentary evidence for an EPC?
Evidence may be needed when work cannot be confirmed from the visit alone, such as a loft conversion, updated double glazing or internal wall insulation. It supports what the homeowner has told the assessor.
Related Apps
Continue Practising
Use a free quiz, then continue in the app with the full question bank.